REGIONAL NEWS

13 September 2017

The device of the bottom layer of asphalt concrete on the street Azerbaijan.

 

The device of the bottom layer of asphalt concrete on the street Azerbaijan. Major repairs of the highway on the street. AZERBAIJAN from Zhangir Khan to the street. Enthusiasts. The general contractor of LLP "AksayBiznesStroy", the length of the site is 1840 meters.

29 August 2017

Forum for the development of the Subcluster "Engineering for the oil and gas industry"

On 25th of August 2017 Forum on the development of the Subcluster "Engineering for the oil and gas industry" took a place in the city of Uralsk. The organizer was the Akimat of West Kazakhstany region.  

28 August 2017

KPO took part in the Forum on the sub-cluster development “Engineering for oil and gas industry in WKO“

West Kazakhstan Oblast, Uralsk, 25 August 2017 - Karachaganak Petroleum Operating b.v. (KPO) took  part in the Forum on the sub-cluster development “Engineering for oil and gas industry in WKO”.